5.1 construction preparation M12 connector Construction of video display system


5.1.1 the construction site shall meet the following requirements:


1. The construction object has basically met the entry conditions, and the operation site and safe power consumption should meet the construction requirements. The power supply and consumption at the construction site shall comply with the relevant provisions of the current national standard GB 50194.


2. The reserved pipes, holes, trunking and embedded parts shall meet the design requirements.


3. Various obstacles and sundries affecting the construction shall be removed.


5.1.2 construction preparation shall meet the following requirements:


1. Design documents, construction scheme, construction schedule and construction drawings shall be complete and have been jointly reviewed and approved.


2. The construction personnel shall be familiar with the construction drawings and all relevant data including engineering characteristics, construction scheme, process requirements, construction quality and acceptance standards.


3. The organization should be sound, the post responsibility should be clear, and the engineering guarantee measures should be formulated.


4 equipment, equipment, auxiliary materials, tools, machinery and communication tools shall meet the requirements of continuous construction and stage construction.