camera module for The ambient light measured on the display surface M12 connector

 camera module for The ambient light measured on the display surface m12 connector (on standard diffuse reflectors) shall be 250 LX with a relative tolerance of ± 5%. If the display is set manually or automatically to night setting (e.g. triggered by headlamp switch or solar load sensor), the displayed information shall meet the requirements of 4.3.2 in night setting. If the driver can manually change the display setting to a higher contrast, the measurement can be made in the display setting. M9 connector.



Monday, December 21, 2020

Sensor Auto Focus Module The requirements of this subclause apply to the display

Sensor Auto Focus Module The requirements of this subclause apply to the display 


The requirements of this subclause apply to the display of the vehicle position on which it is installed, as seen at any point in the driver's eye in accordance with ISO 4513 (passenger cars only). medical connector


If the display is fixed to the vehicle, the requirements shall be observed from the last point of the independent eye ellipse. If the position of the display is adjustable, the display can be adjusted to find a position in which all relevant requirements are complied with at the same time. For direct sunlight conditions, the contrast requirement (see 4.3.2) can only be achieved in the direction of the critical specular reflection (CSL) (see Figure 1). M23 connector

Monday, December 14, 2020

The acceptance of the video display system project shall be completed

 the acceptance organization and responsibilities shall meet the following requirements:


1. The acceptance of the video display system project shall be completed by the construction unit, together with its relevant management departments, supervision, design, construction units and the third-party acceptance organization to establish a project acceptance team.



2. The acceptance organization shall make correct, fair and objective acceptance conclusions for the project according to the design specification, contract, relevant standards and formal design documents.


3 for the projects that have passed the acceptance or basically passed the acceptance, the acceptance organization shall cooperate with the construction unit to supervise and coordinate the implementation of the rectification measures written by the design and construction units according to the acceptance conclusions and approved by the construction units; for the projects that fail to pass the acceptance, the acceptance institutions shall clearly point out the problems and rectification requirements in the acceptance conclusions.

1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance

 1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance


7.3.1 the completion acceptance of video display system project shall meet the following conditions: M9 connector


1. Construction according to formal design documents.


2. The trial operation of the system meets the design requirements and is approved by the construction unit.


3. The preliminary inspection is qualified. M23 connector


7.3.2 before the formal acceptance of the project, the construction, design and construction units shall submit the following data to the project acceptance team:


1. Design specification.


2. Engineering contract.


3. Preliminary design demonstration opinions and detailed design opinions jointly signed by design, construction units and construction units.


4. Formal design documents, relevant drawings and design change notice.


5. System test run report.


6 project completion report.


7 system operation manual (including operation and routine maintenance instructions).


8 project completion accounting report.


9 project preliminary inspection report (including acceptance sheet of concealed works).


10 engineering inspection report.

Monday, December 7, 2020

M12 CONNECTOR The power on test shall meet the following requirements:

M12 CONNECTOR The power on test shall meet the following requirements:


1. Each video display unit, controller and other equipment shall be connected with power supply in different areas and shall not be powered on at the same time. The system joint commissioning should be carried out after the partition debugging is qualified.


2. In case of abnormal operation of the equipment, the power shall be cut off immediately, checked and repaired, and then the equipment shall be re debugged until the equipment operates normally, and the written record shall be made.


5.3.3 the installation of system control software shall meet the following requirements:


1. The operating system with good universality and compatibility should be adopted.


2. The software should be installed according to the requirements of the installation manual.


3. The basic configuration of application software should meet the requirements of display plane layout, display system wiring diagram, display screen size diagram, board bitmap, wiring list, etc.

The construction of usb camera control room shall meet the following requirements:

The construction of usb camera control room shall meet the following requirements:


1. The construction of control room shall meet the design requirements and comply with the relevant provisions of the current national standard "code for construction and acceptance of electronic information system room" (GB 50462 connector).


2. The installation of cabinet and rack shall comply with the relevant provisions of the current national standard "code for quality acceptance of intelligent building engineering" (GB 50339 M12 connector).


3. The termination of all kinds of jumpers and cables shall comply with the relevant provisions of the current national standard code for acceptance of generic cabling system engineering (GB 50312).


4. The installation of the console shall meet the following requirements:


1) The installation of the console shall meet the design requirements.


2) The console should be placed on the horizontal ground, and should be stable and firm.


3) The accessories shall be complete without damage; the table top shall be clean without scratches.


4) The wiring in the console should be arranged reasonably and orderly; the connector should be contacted reliably and installed firmly.


5. The grounding of control room shall meet the design requirements.


5.2.8 lightning protection and grounding of the system shall meet the design requirements, and shall comply with the relevant provisions of the current national standards "code for construction and acceptance of grounding device of electrical installation engineering" GB 50169 and "code for acceptance of construction quality of building electrical engineering" (GB 50303).