1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance

 1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance


7.3.1 the completion acceptance of video display system project shall meet the following conditions: M9 connector


1. Construction according to formal design documents.


2. The trial operation of the system meets the design requirements and is approved by the construction unit.


3. The preliminary inspection is qualified. M23 connector


7.3.2 before the formal acceptance of the project, the construction, design and construction units shall submit the following data to the project acceptance team:


1. Design specification.


2. Engineering contract.


3. Preliminary design demonstration opinions and detailed design opinions jointly signed by design, construction units and construction units.


4. Formal design documents, relevant drawings and design change notice.


5. System test run report.


6 project completion report.


7 system operation manual (including operation and routine maintenance instructions).


8 project completion accounting report.


9 project preliminary inspection report (including acceptance sheet of concealed works).


10 engineering inspection report.