Friday, January 28, 2022

Rectangular connector twist pin High contact density precision twisted elastic pin (twist pin contact)

 Twist pin contact terminal:The production and manufacturing of Rectangular connector twist pin use gold-plated pin and thread to conduct position setting by automatic winding technology in the form of rotating concentric circles according to the standard angle, and use laser welding to weld the two ends of the twist needle. The fusion welding is smooth and firm, and the shape meets the angle design. Tolerance grade: it12, H12, H12. Heat treatment: hv340-360, the inner and outer circle wires are evenly divided, without loose wires and broken wires, Use the 0.58 + 0.01 Jack to check the separation force of the probe: between 0.25N and 0.8N. Beryllium copper C17200 is used for needle and thread, C2680 brass is used for needle body, electroplating requirements: 80u "for the whole bottom and 50U" for gold plating ". This kind of gold plating surface treatment can improve its plug-in resistance up to 50000-100000 times of high performance requirements. The resistance stability reaches the optimal state of all metal plug connection modes, with small volume, good contact and ultra-high times of plug performance.twist pin contact




Monday, January 25, 2021

M12 connectors Product appearance and structure requirements

 M12 connectors Product appearance and structure requirements



6.3.1 the appearance and structure of the product shall meet the requirements of 4.3 in GB / T 9813-2000. M5 connector


6.3.2 the digital video host shall have light indication to show the working status of the host.


6.3.3 there shall be a wiring base in the digital video host cabinet, and the external leads shall be marked with numbers or characters. The lead-in line of AC power supply is in the form of plug socket or welding (plus protection and isolation). usb camera module

Monday, January 11, 2021

For bench measurement, the angle standard value Wireless WiFi Driver Free Camera Module

For bench measurement, the angle standard value Wireless WiFi Driver Free Camera Module (45°/30°) can be used for direct sunlight measurement (see SAE J1757/1:2007).



For matrix displays, measurements should be made on a collection area that covers at least (3×3) the conduct (see Figure 3). If the measurement area is smaller than (3×3), the measurement accuracy will decrease. If the character area to be measured does not contain at least (3×3) pixels or the photometer spot size is larger than the character area, find an area with at least (33) size on the character and visually seem to have the same brightness. Measure this area. m12 connector

For segmented display, the measurement should be performed within the segmented segment. The diameter of the collection area should be less than 80% of the relevant size of the section to be measured. M23 connector

Monday, January 4, 2021

500W autofocus camera module webcam module M8 M12 connector cable

 500W autofocus camera module webcam module Character overview




If sufficient contrast between the role and its background cannot be provided (for example, with a dynamic background), other means should be used. This can be the outline around the character, in which case minimum contrast should be provided between the body of the character / unfilled area and its outline. m8 connector


For characters with serifs, the stroke width of the height ratio of outline characters should be less than 0.04, and for characters without serifs, it should be less than 0,08. If the size of the character is so small that the stroke width of the outline is less than 0.35 mm, avoid using the outline to ensure readability (see Figure 2). M12 connector

Monday, December 28, 2020

camera module for The ambient light measured on the display surface M12 connector

 camera module for The ambient light measured on the display surface m12 connector (on standard diffuse reflectors) shall be 250 LX with a relative tolerance of ± 5%. If the display is set manually or automatically to night setting (e.g. triggered by headlamp switch or solar load sensor), the displayed information shall meet the requirements of 4.3.2 in night setting. If the driver can manually change the display setting to a higher contrast, the measurement can be made in the display setting. M9 connector.



Monday, December 21, 2020

Sensor Auto Focus Module The requirements of this subclause apply to the display

Sensor Auto Focus Module The requirements of this subclause apply to the display 


The requirements of this subclause apply to the display of the vehicle position on which it is installed, as seen at any point in the driver's eye in accordance with ISO 4513 (passenger cars only). medical connector


If the display is fixed to the vehicle, the requirements shall be observed from the last point of the independent eye ellipse. If the position of the display is adjustable, the display can be adjusted to find a position in which all relevant requirements are complied with at the same time. For direct sunlight conditions, the contrast requirement (see 4.3.2) can only be achieved in the direction of the critical specular reflection (CSL) (see Figure 1). M23 connector

Monday, December 14, 2020

The acceptance of the video display system project shall be completed

 the acceptance organization and responsibilities shall meet the following requirements:


1. The acceptance of the video display system project shall be completed by the construction unit, together with its relevant management departments, supervision, design, construction units and the third-party acceptance organization to establish a project acceptance team.



2. The acceptance organization shall make correct, fair and objective acceptance conclusions for the project according to the design specification, contract, relevant standards and formal design documents.


3 for the projects that have passed the acceptance or basically passed the acceptance, the acceptance organization shall cooperate with the construction unit to supervise and coordinate the implementation of the rectification measures written by the design and construction units according to the acceptance conclusions and approved by the construction units; for the projects that fail to pass the acceptance, the acceptance institutions shall clearly point out the problems and rectification requirements in the acceptance conclusions.

1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance

 1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance


7.3.1 the completion acceptance of video display system project shall meet the following conditions: M9 connector


1. Construction according to formal design documents.


2. The trial operation of the system meets the design requirements and is approved by the construction unit.


3. The preliminary inspection is qualified. M23 connector


7.3.2 before the formal acceptance of the project, the construction, design and construction units shall submit the following data to the project acceptance team:


1. Design specification.


2. Engineering contract.


3. Preliminary design demonstration opinions and detailed design opinions jointly signed by design, construction units and construction units.


4. Formal design documents, relevant drawings and design change notice.


5. System test run report.


6 project completion report.


7 system operation manual (including operation and routine maintenance instructions).


8 project completion accounting report.


9 project preliminary inspection report (including acceptance sheet of concealed works).


10 engineering inspection report.

Monday, December 7, 2020

M12 CONNECTOR The power on test shall meet the following requirements:

M12 CONNECTOR The power on test shall meet the following requirements:


1. Each video display unit, controller and other equipment shall be connected with power supply in different areas and shall not be powered on at the same time. The system joint commissioning should be carried out after the partition debugging is qualified.


2. In case of abnormal operation of the equipment, the power shall be cut off immediately, checked and repaired, and then the equipment shall be re debugged until the equipment operates normally, and the written record shall be made.


5.3.3 the installation of system control software shall meet the following requirements:


1. The operating system with good universality and compatibility should be adopted.


2. The software should be installed according to the requirements of the installation manual.


3. The basic configuration of application software should meet the requirements of display plane layout, display system wiring diagram, display screen size diagram, board bitmap, wiring list, etc.

The construction of usb camera control room shall meet the following requirements:

The construction of usb camera control room shall meet the following requirements:


1. The construction of control room shall meet the design requirements and comply with the relevant provisions of the current national standard "code for construction and acceptance of electronic information system room" (GB 50462 connector).


2. The installation of cabinet and rack shall comply with the relevant provisions of the current national standard "code for quality acceptance of intelligent building engineering" (GB 50339 M12 connector).


3. The termination of all kinds of jumpers and cables shall comply with the relevant provisions of the current national standard code for acceptance of generic cabling system engineering (GB 50312).


4. The installation of the console shall meet the following requirements:


1) The installation of the console shall meet the design requirements.


2) The console should be placed on the horizontal ground, and should be stable and firm.


3) The accessories shall be complete without damage; the table top shall be clean without scratches.


4) The wiring in the console should be arranged reasonably and orderly; the connector should be contacted reliably and installed firmly.


5. The grounding of control room shall meet the design requirements.


5.2.8 lightning protection and grounding of the system shall meet the design requirements, and shall comply with the relevant provisions of the current national standards "code for construction and acceptance of grounding device of electrical installation engineering" GB 50169 and "code for acceptance of construction quality of building electrical engineering" (GB 50303).

Monday, November 30, 2020

Engineering equipment and equipment shall meet the following requirements:

 Engineering equipment and equipment shall meet the following requirements:


1. For the mobilization of equipment and materials, table a.0.1-1 in Appendix A of this specification or the equipment and material mobilization inspection form provided by the supervision unit shall be filled in. The materials shall be counted and classified according to the construction equipment and material list.


2. During the open box inspection, the name, model, specification, quantity and place of origin of the equipment shall meet the design requirements, the appearance shall be intact, the technical data and accessories shall be complete, and the factory certificate shall be provided.


3. The function and performance of the equipment shall be checked by power on, and the test shall be carried out according to the corresponding current national product standards; if there is no national standard, it shall be carried out according to the contract provisions or design requirements; for the equipment without on-site inspection conditions, the factory test or the organization with inspection ability can be required to test, and the test report shall be issued.


4. The quality inspection contents of hardware equipment and materials shall include safety, reliability and electromagnetic compatibility.


5. The quality of software products shall be inspected according to the following contents:


1) For commercial software such as operating system, database management system, application system software, information security software and network management software, the use license and scope of use shall be checked.


2) The user application software, user configuration software and other application software compiled by the system Contractor shall not only carry out function test and system test, but also carry out capacity, reliability, safety, recoverability, compatibility, self diagnosis and other function tests as required. The software data such as program structure description, installation and debugging instructions, use and maintenance instructions shall be complete.


6 in addition to the provisions of article 1-5, the imported products shall also provide the certificate of origin and commodity inspection certificate; the product qualification certificate, inspection report, installation, use and maintenance instructions and other documents shall be in Chinese or attached with Chinese translation.

camera module M12 connector Construction of video display system

 camera module M12 connector Construction of video display system




5.1 construction preparation M12 connector Construction of video display system


5.1.1 the construction site shall meet the following requirements:


1. The construction object has basically met the entry conditions, and the operation site and safe power consumption should meet the construction requirements. The power supply and consumption at the construction site shall comply with the relevant provisions of the current national standard GB 50194.


2. The reserved pipes, holes, trunking and embedded parts shall meet the design requirements.


3. Various obstacles and sundries affecting the construction shall be removed.


5.1.2 construction preparation shall meet the following requirements:


1. Design documents, construction scheme, construction schedule and construction drawings shall be complete and have been jointly reviewed and approved.


2. The construction personnel shall be familiar with the construction drawings and all relevant data including engineering characteristics, construction scheme, process requirements, construction quality and acceptance standards.


3. The organization should be sound, the post responsibility should be clear, and the engineering guarantee measures should be formulated.


4 equipment, equipment, auxiliary materials, tools, machinery and communication tools shall meet the requirements of continuous construction and stage construction.

Monday, November 16, 2020

the classification of LED video display system shall meet the following requirements:

 Classification and classification of LED video display system


3.1.1 the classification of LED video display system shall meet the following requirements:


It can be divided into indoor display system and outdoor display system according to the use environment.


According to the display color, it can be divided into single primary color display system, double primary color display system and full color (red, green, blue three primary color) display system.


3.1.2 LED video display system can be divided into three levels: A, B and C. The performance and index of all levels of LED video display system shall meet the requirements of table 3.1.2.

AHD Camera Module from jsk technology china

 AHD Camera Module from jsk  technology china



Classification and classification of TV video display system


3.3.1 the classification of TV video display system shall meet the following requirements:


It can be divided into CRT, LCD, PDP and other display systems according to the types of display devices.


It can be divided into single screen TV display system and splicing display system according to the composition and quantity of display screen.




3.3.2 TV splicing video display system can be classified according to the provisions of article 3.2.2 of this specification.

Monday, September 7, 2020

13MP Camera Module cable assembly Tut tested terminal

13MP Camera Module cable assembly Tut tested terminal

 RH relative humidity




ROA temperature rise


TPA terminal position is ensured. See forward locking plus strength.



Uscar American Automotive Research Council. From Ford Motor Company, general motors company and DaimlerChrysler Co


An association of representatives of the division that conducts joint research to enhance the competitiveness of the U.S. automotive industry in non competitive regions


Research.


VD voltage drop

Baby Monitor Camera Module M12-connectors Design points

Baby Monitor Camera Module M12-connectors   Design points


For maximum rated current:




Note: the "maximum test power capacity" (section 5.3.3) detailed in this document is intended to establish test parameters. From here on


The parameters obtained are intended to limit the current in the 1008 hour current cycling test. The data collected during this test can also be


In order to compare the test results of different terminals under the same test specification. This test cannot Baby Monitor Camera Module M12-connectors Design points.


Determine the maximum current capacity of a specified size terminal. For a given application, in addition to the current load, other factors should be considered


Many factors. That can be passed through a terminal grip and


Interface over the life of the vehicle Baby Monitor Camera Module M12-connectors Design points.

Monday, August 31, 2020

720P USB2.0 Wide Angle Camera Module

 

720P USB2.0 Wide Angle Camera Module 


Retention:


Those acting on a single contact (terminal) do not cause them to come out of the correct position in the connector cavity


The maximum force of separation. There may be two different values for this force; one is that the relevant wedge (TPA) has been installed,


PLK, and so on), and the other is the value without these wedges installed.


Room temperature:


23°C ± 5°C


Separation force:


The force required to separate a pair of engaged contacts (terminals) or to separate a contact from a paired test instrument.

720P USB2.0 Wide Angle Camera Module



Circuit signal:


A circuit capable of providing a current of 5 A or less at all times


Soaking:


It refers to a period of time when the equipment under test is exposed to specified environmental conditions, such as temperature, humidity, current, etc.


The exposure process may be a preparation for another subsequent test, or it may be a specific test itself Part of.

Infrared Monitoring Camera Module M8 cable

Infrared Monitoring Camera Module M8 cable


 Maximum current capacity:


The maximum current carrying capacity refers to the terminal size, wire diameter and insulation class at room temperature determined according to section 5.3.3


The maximum current carrying capacity of a specific combination. The value must conform to the actual state of the specified application.


Mechanical auxiliary force:


Reduce the amount that operators use to fit the two halves of the connector or fit a connector to an end plate


The auxiliary means of force. Typical aids are the use of bolts, cams or levers.


Rated current:

Infrared Monitoring Camera Module M8 cable

According to wire size.


Power supply circuit: Infrared Monitoring Camera Module M8 cable


A circuit capable of continuously supplying more than 5A current for more than one minute.


Contact with heavy metals;


Where the terminals are connected to electricity, they need to be plated with gold, alloy, platinum or silver.Infrared Monitoring Camera Module M8 cable。

Monday, August 24, 2020

USB Camera M20 connector

 USB Camera M20 connector Remove or cut away to make room for slits, collets, and spindles. For clamping and fixing, if necessary, insert the pin


May be shortened. For a given structure, all pin positions should be tested, and in any case


The number of pins should not be less than 10.


1. By "dry as moulded parts", the samples were wet at 95-98% relative humidity and 40 ℃


Then the pull-out test was completed immediately.


2. If possible, the measurement should be carried out in both directions, for example, push the pin longitudinally through the connector, and then pull it out


It's like pulling the socket out of the end plate. In order to get the correct reading, according to personal design, "push" and "pull" should be the same


On the contrary. In a particular design, the connector tail may be properly loaded. For accurate results, the pressure and tension


It must be parallel to the center line of the pin. For pins with curved end plates in the vicinity of short plates, if necessary


The bent end plate can be cut. If it is necessary to cut the pin before applying the force to the test, we should first cut the pin


This will not affect the test results.


3. Fix the connector body in a suitable fixture.




The force tester applies an inclined pressure to the terminal pin. At the beginning of the pin in the plastic sheath or end plate attached


Note and record the forces as they begin to be replaced. Repeat for each pin position. When the connector sheath


When the inevitable damage affects the reading of the adjacent terminal hole, transfer it to an undamaged pin


Or use a new connector.


5. Repeat step 3 by reversing the direction of force according to the sample to be selected


USB Camera cable splitter -USB Camera cable splitter Retention of end plate pins

 USB Camera cable splitter Retention of end plate pins


5.7.1.1 purpose


The terminal pull-out test is used to determine the retention force of the socket terminal under the conditions of a specific pin or a molded end plate connector.


It can also be used to test the attachment of the plug pin when it is directly fixed or soldered to the circuit board. Appropriate pin protection


The holding force can ensure that the terminal will not be replaced by the normal insertion and pull-out force of the mating connector. These requirements can only be applied to


Finished devices, not for "in process" products, such as pin blocks or other semi assembled products. Units and / or connections


The provider needs to decide at which stage of the process these requirements will be tested and validated.


5.7.1.2 equipment


The insertion / pull-out force tester with peak number characteristics.


Suitable connector fixing device.


{collets, spindles or clamps holding terminals and / or pins in a longitudinal direction.


5.7.1.3 operation process USB Camera cable splitter Retention of end plate pins.


Note: the sample should be produced according to the intention of the product. For structures with very close pin arrangements, pins or terminals need to be selectively grounded