Night Vision Monitoring Camera Module M9 connector
Acceptance criteria
At the end of the test, verify that each pair of terminals and each sample connector assembly comply with 5.1.9.4 (continuous monitoring) and
Face acceptance criteria.
A. First, small power (weak current) circuit resistance test, chapter 5.3.1.4.
B. Second, voltage drop test, chapter 5.3.2.4.M9 connector
Note: if the sample is to be further tested (e.g. as part of the test sequence listed in section 5.9.6)
The following steps should be postponed until the end of the sequence.
With the help of a 10x magnifying glass, do not see anything on the connector assembly that will affect the assembly and function of the connector or seriously degrade it
Defects such as damage, cracking and deformation of low appearance quality.
Assemble at least 10 pairs of fully engaged connectors (at least 10 plugs and 10 sockets) as specified in section 5.1.6
Connector half). Use any conductor size and insulation type applicable. Assembly must include all applicable wedges
(TPAs, PLRS, etc.), seals, etc. Number each mating connector.
No comments:
Post a Comment