camera module for The ambient light measured on the display surface m12 connector (on standard diffuse reflectors) shall be 250 LX with a relative tolerance of ± 5%. If the display is set manually or automatically to night setting (e.g. triggered by headlamp switch or solar load sensor), the displayed information shall meet the requirements of 4.3.2 in night setting. If the driver can manually change the display setting to a higher contrast, the measurement can be made in the display setting. M9 connector.
Ximeconn Technology is a professional manufacturer of industrial sensor waterproof connectors,2D 3D design services,M12 connector,M8connector,M5 connector,military equipment waterproof box,car wiring harness,etc.
Monday, December 28, 2020
Monday, December 21, 2020
Sensor Auto Focus Module The requirements of this subclause apply to the display
Sensor Auto Focus Module The requirements of this subclause apply to the display
The requirements of this subclause apply to the display of the vehicle position on which it is installed, as seen at any point in the driver's eye in accordance with ISO 4513 (passenger cars only). medical connector
If the display is fixed to the vehicle, the requirements shall be observed from the last point of the independent eye ellipse. If the position of the display is adjustable, the display can be adjusted to find a position in which all relevant requirements are complied with at the same time. For direct sunlight conditions, the contrast requirement (see 4.3.2) can only be achieved in the direction of the critical specular reflection (CSL) (see Figure 1). M23 connector
Monday, December 14, 2020
The acceptance of the video display system project shall be completed
the acceptance organization and responsibilities shall meet the following requirements:
1. The acceptance of the video display system project shall be completed by the construction unit, together with its relevant management departments, supervision, design, construction units and the third-party acceptance organization to establish a project acceptance team.
2. The acceptance organization shall make correct, fair and objective acceptance conclusions for the project according to the design specification, contract, relevant standards and formal design documents.
3 for the projects that have passed the acceptance or basically passed the acceptance, the acceptance organization shall cooperate with the construction unit to supervise and coordinate the implementation of the rectification measures written by the design and construction units according to the acceptance conclusions and approved by the construction units; for the projects that fail to pass the acceptance, the acceptance institutions shall clearly point out the problems and rectification requirements in the acceptance conclusions.
1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance
1080P USB2.0 Projector Camera Module Conditions and organization of project completion acceptance
7.3.1 the completion acceptance of video display system project shall meet the following conditions: M9 connector
1. Construction according to formal design documents.
2. The trial operation of the system meets the design requirements and is approved by the construction unit.
3. The preliminary inspection is qualified. M23 connector
7.3.2 before the formal acceptance of the project, the construction, design and construction units shall submit the following data to the project acceptance team:
1. Design specification.
2. Engineering contract.
3. Preliminary design demonstration opinions and detailed design opinions jointly signed by design, construction units and construction units.
4. Formal design documents, relevant drawings and design change notice.
5. System test run report.
6 project completion report.
7 system operation manual (including operation and routine maintenance instructions).
8 project completion accounting report.
9 project preliminary inspection report (including acceptance sheet of concealed works).
10 engineering inspection report.
Monday, December 7, 2020
M12 CONNECTOR The power on test shall meet the following requirements:
M12 CONNECTOR The power on test shall meet the following requirements:
1. Each video display unit, controller and other equipment shall be connected with power supply in different areas and shall not be powered on at the same time. The system joint commissioning should be carried out after the partition debugging is qualified.
2. In case of abnormal operation of the equipment, the power shall be cut off immediately, checked and repaired, and then the equipment shall be re debugged until the equipment operates normally, and the written record shall be made.
5.3.3 the installation of system control software shall meet the following requirements:
1. The operating system with good universality and compatibility should be adopted.
2. The software should be installed according to the requirements of the installation manual.
3. The basic configuration of application software should meet the requirements of display plane layout, display system wiring diagram, display screen size diagram, board bitmap, wiring list, etc.
The construction of usb camera control room shall meet the following requirements:
The construction of usb camera control room shall meet the following requirements:
1. The construction of control room shall meet the design requirements and comply with the relevant provisions of the current national standard "code for construction and acceptance of electronic information system room" (GB 50462 connector).
2. The installation of cabinet and rack shall comply with the relevant provisions of the current national standard "code for quality acceptance of intelligent building engineering" (GB 50339 M12 connector).
3. The termination of all kinds of jumpers and cables shall comply with the relevant provisions of the current national standard code for acceptance of generic cabling system engineering (GB 50312).
4. The installation of the console shall meet the following requirements:
1) The installation of the console shall meet the design requirements.
2) The console should be placed on the horizontal ground, and should be stable and firm.
3) The accessories shall be complete without damage; the table top shall be clean without scratches.
4) The wiring in the console should be arranged reasonably and orderly; the connector should be contacted reliably and installed firmly.
5. The grounding of control room shall meet the design requirements.
5.2.8 lightning protection and grounding of the system shall meet the design requirements, and shall comply with the relevant provisions of the current national standards "code for construction and acceptance of grounding device of electrical installation engineering" GB 50169 and "code for acceptance of construction quality of building electrical engineering" (GB 50303).
Monday, November 30, 2020
Engineering equipment and equipment shall meet the following requirements:
Engineering equipment and equipment shall meet the following requirements:
1. For the mobilization of equipment and materials, table a.0.1-1 in Appendix A of this specification or the equipment and material mobilization inspection form provided by the supervision unit shall be filled in. The materials shall be counted and classified according to the construction equipment and material list.
2. During the open box inspection, the name, model, specification, quantity and place of origin of the equipment shall meet the design requirements, the appearance shall be intact, the technical data and accessories shall be complete, and the factory certificate shall be provided.
3. The function and performance of the equipment shall be checked by power on, and the test shall be carried out according to the corresponding current national product standards; if there is no national standard, it shall be carried out according to the contract provisions or design requirements; for the equipment without on-site inspection conditions, the factory test or the organization with inspection ability can be required to test, and the test report shall be issued.
4. The quality inspection contents of hardware equipment and materials shall include safety, reliability and electromagnetic compatibility.
5. The quality of software products shall be inspected according to the following contents:
1) For commercial software such as operating system, database management system, application system software, information security software and network management software, the use license and scope of use shall be checked.
2) The user application software, user configuration software and other application software compiled by the system Contractor shall not only carry out function test and system test, but also carry out capacity, reliability, safety, recoverability, compatibility, self diagnosis and other function tests as required. The software data such as program structure description, installation and debugging instructions, use and maintenance instructions shall be complete.
6 in addition to the provisions of article 1-5, the imported products shall also provide the certificate of origin and commodity inspection certificate; the product qualification certificate, inspection report, installation, use and maintenance instructions and other documents shall be in Chinese or attached with Chinese translation.
camera module M12 connector Construction of video display system
camera module M12 connector Construction of video display system
5.1 construction preparation M12 connector Construction of video display system
5.1.1 the construction site shall meet the following requirements:
1. The construction object has basically met the entry conditions, and the operation site and safe power consumption should meet the construction requirements. The power supply and consumption at the construction site shall comply with the relevant provisions of the current national standard GB 50194.
2. The reserved pipes, holes, trunking and embedded parts shall meet the design requirements.
3. Various obstacles and sundries affecting the construction shall be removed.
5.1.2 construction preparation shall meet the following requirements:
1. Design documents, construction scheme, construction schedule and construction drawings shall be complete and have been jointly reviewed and approved.
2. The construction personnel shall be familiar with the construction drawings and all relevant data including engineering characteristics, construction scheme, process requirements, construction quality and acceptance standards.
3. The organization should be sound, the post responsibility should be clear, and the engineering guarantee measures should be formulated.
4 equipment, equipment, auxiliary materials, tools, machinery and communication tools shall meet the requirements of continuous construction and stage construction.
Monday, November 16, 2020
the classification of LED video display system shall meet the following requirements:
Classification and classification of LED video display system
3.1.1 the classification of LED video display system shall meet the following requirements:
It can be divided into indoor display system and outdoor display system according to the use environment.
According to the display color, it can be divided into single primary color display system, double primary color display system and full color (red, green, blue three primary color) display system.
3.1.2 LED video display system can be divided into three levels: A, B and C. The performance and index of all levels of LED video display system shall meet the requirements of table 3.1.2.
AHD Camera Module from jsk technology china
AHD Camera Module from jsk technology china
Classification and classification of TV video display system
3.3.1 the classification of TV video display system shall meet the following requirements:
It can be divided into CRT, LCD, PDP and other display systems according to the types of display devices.
It can be divided into single screen TV display system and splicing display system according to the composition and quantity of display screen.
3.3.2 TV splicing video display system can be classified according to the provisions of article 3.2.2 of this specification.
Monday, September 7, 2020
13MP Camera Module cable assembly Tut tested terminal
13MP Camera Module cable assembly Tut tested terminal
RH relative humidity
ROA temperature rise
TPA terminal position is ensured. See forward locking plus strength.
Uscar American Automotive Research Council. From Ford Motor Company, general motors company and DaimlerChrysler Co
An association of representatives of the division that conducts joint research to enhance the competitiveness of the U.S. automotive industry in non competitive regions
Research.
VD voltage drop
Baby Monitor Camera Module M12-connectors Design points
Baby Monitor Camera Module M12-connectors Design points
For maximum rated current:
Note: the "maximum test power capacity" (section 5.3.3) detailed in this document is intended to establish test parameters. From here on
The parameters obtained are intended to limit the current in the 1008 hour current cycling test. The data collected during this test can also be
In order to compare the test results of different terminals under the same test specification. This test cannot Baby Monitor Camera Module M12-connectors Design points.
Determine the maximum current capacity of a specified size terminal. For a given application, in addition to the current load, other factors should be considered
Many factors. That can be passed through a terminal grip and
Interface over the life of the vehicle Baby Monitor Camera Module M12-connectors Design points.
Monday, August 31, 2020
720P USB2.0 Wide Angle Camera Module
720P USB2.0 Wide Angle Camera Module
Retention:
Those acting on a single contact (terminal) do not cause them to come out of the correct position in the connector cavity
The maximum force of separation. There may be two different values for this force; one is that the relevant wedge (TPA) has been installed,
PLK, and so on), and the other is the value without these wedges installed.
Room temperature:
23°C ± 5°C
Separation force:
The force required to separate a pair of engaged contacts (terminals) or to separate a contact from a paired test instrument.
720P USB2.0 Wide Angle Camera Module
Circuit signal:
A circuit capable of providing a current of 5 A or less at all times
Soaking:
It refers to a period of time when the equipment under test is exposed to specified environmental conditions, such as temperature, humidity, current, etc.
The exposure process may be a preparation for another subsequent test, or it may be a specific test itself Part of.
Infrared Monitoring Camera Module M8 cable
Infrared Monitoring Camera Module M8 cable
Maximum current capacity:
The maximum current carrying capacity refers to the terminal size, wire diameter and insulation class at room temperature determined according to section 5.3.3
The maximum current carrying capacity of a specific combination. The value must conform to the actual state of the specified application.
Reduce the amount that operators use to fit the two halves of the connector or fit a connector to an end plate
The auxiliary means of force. Typical aids are the use of bolts, cams or levers.
Rated current:
Infrared Monitoring Camera Module M8 cable
According to wire size.
Power supply circuit: Infrared Monitoring Camera Module M8 cable
A circuit capable of continuously supplying more than 5A current for more than one minute.
Contact with heavy metals;
Where the terminals are connected to electricity, they need to be plated with gold, alloy, platinum or silver.Infrared Monitoring Camera Module M8 cable。
Monday, August 24, 2020
USB Camera M20 connector
USB Camera M20 connector Remove or cut away to make room for slits, collets, and spindles. For clamping and fixing, if necessary, insert the pin
May be shortened. For a given structure, all pin positions should be tested, and in any case
The number of pins should not be less than 10.
1. By "dry as moulded parts", the samples were wet at 95-98% relative humidity and 40 ℃
Then the pull-out test was completed immediately.
2. If possible, the measurement should be carried out in both directions, for example, push the pin longitudinally through the connector, and then pull it out
It's like pulling the socket out of the end plate. In order to get the correct reading, according to personal design, "push" and "pull" should be the same
On the contrary. In a particular design, the connector tail may be properly loaded. For accurate results, the pressure and tension
It must be parallel to the center line of the pin. For pins with curved end plates in the vicinity of short plates, if necessary
The bent end plate can be cut. If it is necessary to cut the pin before applying the force to the test, we should first cut the pin
This will not affect the test results.
3. Fix the connector body in a suitable fixture.
The force tester applies an inclined pressure to the terminal pin. At the beginning of the pin in the plastic sheath or end plate attached
Note and record the forces as they begin to be replaced. Repeat for each pin position. When the connector sheath
When the inevitable damage affects the reading of the adjacent terminal hole, transfer it to an undamaged pin
Or use a new connector.
5. Repeat step 3 by reversing the direction of force according to the sample to be selected
USB Camera cable splitter -USB Camera cable splitter Retention of end plate pins
USB Camera cable splitter Retention of end plate pins
5.7.1.1 purpose
The terminal pull-out test is used to determine the retention force of the socket terminal under the conditions of a specific pin or a molded end plate connector.
It can also be used to test the attachment of the plug pin when it is directly fixed or soldered to the circuit board. Appropriate pin protection
The holding force can ensure that the terminal will not be replaced by the normal insertion and pull-out force of the mating connector. These requirements can only be applied to
Finished devices, not for "in process" products, such as pin blocks or other semi assembled products. Units and / or connections
The provider needs to decide at which stage of the process these requirements will be tested and validated.
5.7.1.2 equipment
The insertion / pull-out force tester with peak number characteristics.
Suitable connector fixing device.
{collets, spindles or clamps holding terminals and / or pins in a longitudinal direction.
5.7.1.3 operation process USB Camera cable splitter Retention of end plate pins.
Note: the sample should be produced according to the intention of the product. For structures with very close pin arrangements, pins or terminals need to be selectively grounded
Monday, August 17, 2020
Low Power Camera Module M5 connector
Low Power Camera Module M5 connector If the sample has not been cycled through the connector and / or terminal of 5.1.7, it is completed.
3. Verify that each sample connector assembly meets the following acceptance criteria. Low power (weak current) circuit resistance test,
Chapter 5.3.1.4. If the test is performed separately. At least 10 pairs of terminals in the sample shall be measured at random.
4. Before the start of the test, the test fixture, system layout and test device must be approved by the authorized person.
5. Place the sample in the temperature chamber where the air flow to the sample will not be hindered and the samples will not touch each other
Put it on Low Power Camera Module M5 connector.
6. Refer to figure 5.1.4 to determine the temperature class that meets the requirements of the specified application of the connector system. Then set the temperature chamber at
At the lowest temperature of the grade. Stabilize the temperature of the temperature chamber before proceeding
Night Vision Monitoring Camera Module M9 connector
Night Vision Monitoring Camera Module M9 connector
Acceptance criteria
At the end of the test, verify that each pair of terminals and each sample connector assembly comply with 5.1.9.4 (continuous monitoring) and
Face acceptance criteria.
A. First, small power (weak current) circuit resistance test, chapter 5.3.1.4.
B. Second, voltage drop test, chapter 5.3.2.4.M9 connector
Note: if the sample is to be further tested (e.g. as part of the test sequence listed in section 5.9.6)
The following steps should be postponed until the end of the sequence.
With the help of a 10x magnifying glass, do not see anything on the connector assembly that will affect the assembly and function of the connector or seriously degrade it
Defects such as damage, cracking and deformation of low appearance quality.
Assemble at least 10 pairs of fully engaged connectors (at least 10 plugs and 10 sockets) as specified in section 5.1.6
Connector half). Use any conductor size and insulation type applicable. Assembly must include all applicable wedges
(TPAs, PLRS, etc.), seals, etc. Number each mating connector.
Monday, August 10, 2020
Medical appliances M30 connector Force from bulk (open) position to self-locking position
Medical appliances M30 connector :
B. Force from bulk (open) position to self-locking position
1. Use the connector without control lever to put the control rod or sliding vane in bulk position.
2. Force tester, gradually apply a force of 30n in one direction to assemble the control rod or sliding vane to the self-locking position
3. Verify whether the acceptance criteria of 5.4.3.4-3 are met.
C. Lever impulse / removal force
1. Test the force required to move the connector from the pre activated state to the fully used state and close the lever. It should be as much as possible
The orthogonal force can be applied close to the contact surface of the control rod or sliding plate.
2. For the connector with secondary self-locking structure, maintain this feature and gradually apply a 60N force at its release position.
3. If applicable, release all existing release mechanisms and record the amount required to move the lever from the locked position to the free position Force.
Medical appliances M6 Connector to connector fit / release force (connector with mechanical assistance)
Medical appliances M6 connector :
Connector to connector fit / release force (connector with mechanical assistance)
5.4.3.1 purpose
This test includes the pulling and pulling force of the connector with self-locking structure such as control rod or locking plate. Ergonomics in uscar-25
The guidelines should be applied as a long-term reference.
5.4.3.2 equipment
? force tester
The fixture for fixing the connector
5.4.3.2.1 sample
Sufficient plug ends shall be prepared in accordance with section 5.1.6 (preparation of terminal samples) using suitable conductor size and insulation type
Sub and socket terminals to assemble connectors. Three tests a, B and C were carried out.
Prepare connector samples, including accessories such as wires, terminals and secondary locks, according to the design specification and product use intention
And so on. In each section below, prepare at least 10 sets of samples. Samples may be reused.
Test D; prepare plug terminal and socket sheath for assembly test.
Engagement force to preassembled position Medical appliances M6 connector .
1. Force tester to engage each connector to the preassembled position.
2. Reverse the direction and record the force required to move the connector from the pre installed position to the UN seat position.
3. Verify whether the acceptance criteria of 5.4.3.4-1 and 5.4.3.4-2 are met.
Monday, August 3, 2020
Industrial Electronics M30 cable
Industrial Electronics M14 cable
Monday, July 27, 2020
Industrial Electronics M6 connector
Industrial Electronics RF CABLE
Monday, July 20, 2020
Cameras Peripherals It is clearly identified in the drawing.
Cameras Peripherals M23 cable
Monday, July 13, 2020
Cameras Peripherals M5 cable
Cameras Peripherals M10 connector
Monday, July 6, 2020
Tools Machinery industrial M6 cable 1500V 200A
Tools Machinery industrial M6 cable 1500V 200A |
Tools Machinery industrial circular connector
Tools Machinery industrial circular connector |
Monday, June 29, 2020
Tools Machinery industrial RFI / EMI shielding performance B Series E series K series s series
Tools Machinery industrial RFI / EMI shielding performance B Series E series K series s series |
Tools Machinery industrial 5G M9 connector
Tools Machinery industrial 5G M9 connector |
Monday, June 22, 2020
Cameras Peripherals M14 cable
Cameras Peripherals M14 cable |
Cameras Peripherals M8 cable Switch
Cameras Peripherals M8 cable Switch |
Sunday, June 14, 2020
Low voltage apparatus M30 connector
Low voltage apparatus M30 connector |
Low voltage apparatus M16 connector
Sunday, June 7, 2020
weak current equipment M16 cable M40 connector
weak current equipment M16 cable M40 connector |
weak current equipment M12 cable
weak current equipment M12 cable |
Monday, June 1, 2020
weak current equipment M14 connector
Shrinkage cavity: the irregular shape and rough surface hole caused by insufficient internal compensation during the condensation process of die casting.
Under casting: filling incomplete parts in the process of die casting.
weak current equipment M14 connector |
Crack: the alloy matrix is damaged or broken, forming a long and thin gap, which is irregular and linear. There are two kinds of cracks: penetrating and non penetrating
There is a trend of development under the influence of external forces. Cracks can be divided into cold cracks and hot cracks. The main difference is the cold crack casting
The metal at the crack is not oxidized while the hot crack is oxidized.
Wrong mold: when the mold is closed, the relative position of the moving part (including the movable part of the mold) and the fixed mold are not accurate, resulting in the dislocation (relative displacement) trace of the casting shape. In general, it is called wrong thread.
Non ferrous spot: a spot on the surface of a casting that is different from the color of the base metal. ,
Pockmarked surface: in the process of filling the cavity with liquid metal, fine pockmarks with linear distribution (mostly dense) are formed on the surface of the casting
The area formed.
Ejector mark: the mark of protrusion or depression left after the surface of the die-casting is in contact with the inlaid or movable part of the die, ejector, etc.
Inclusions: metal or non-metal impurities mixed into the die casting. After the casting is processed, the size of the irregular shape is shown here,
The spots or holes with different colors and brightness are often partially or completely filled with impurities.
Loose: the small holes on the die casting caused by aggregation or dispersion cause local non dense structure.
Flash: sheet metal on the edge of the parting surface (or moving part) of a die casting.
Fleshy: the same part of the surface of the die-casting repeatedly appears redundant protruding parts of the same shape.
Deformation: the overall deformation of the die-casting parts whose geometry does not conform to the drawing.
Mechanical damage: the scar on the surface of die casting caused by mechanical impact.
Brittleness: the grain of casting base metal is too coarse or small, which makes the casting easy to break or break.
Leakage: the die casting has water leakage, air leakage or water seepage after test.
weak current equipment M8 connector M9 connector
Air hole (sand hole): the hole with regular shape and smooth surface formed by the gas involved in the die casting.M9 connector
Flow mark: on the surface of the die casting, there is a line consistent with the flow direction of the liquid metal, which can be felt by hand to be locally depressed, which is a defect
There is no possibility of development.M10 connector
vacuum bipolar RF socket
Cold insulation: Joint mark caused by butt joint or non fusion of metal flow. Its intersection edge is smooth, with penetration and non penetration
Species have a trend of continuous development under the action of external forces.
Scratch: there is a certain depth of line like damage trace on the surface of the casting along the direction of casting, which is a stack of scars in serious cases.
Dent: a concave part on the smooth surface of a die casting.
Adherent trace: the trace left on the die casting due to the falling off of sheet metal or coating accumulation, if the sheet metal does not fall off,
If the local fusion has obvious metal layer on the casting, it is delamination.
Net burr: a net protrusion (or concave pattern) on the surface of the casting caused by the cracks on the surface of the mold cavity.
Bubble: the bubble formed by the gas bulging in the subcutaneous pores of the die casting.
weak current equipment M8 connector M9 connector |
Monday, May 25, 2020
Industrial robot M10 connector
Industrial robot M10 connector |
Industrial robot M10 connector |
Industrial robot M16 connector medical connector Amphenel AISG C091 connector assembly
Industrial robot M16 connector medical connector Amphenel AISG C091 connector assembly |
Monday, May 18, 2020
Communication Equipment M20 cable Insertion force
Communication Equipment M20 cable Insertion force |
a. Place the two matching electronic connectors in the initial position of the mechanical assembly, and the reading of the dynamometer and the torque meter is zero.
b. Fully insert (match) the connector according to the force rate specified in the specification, and record the peak value of insertion force.
3. Pull out force
Pull out the connector completely according to the force rate specified in the specification, and record the peak pulling force.
4. Details
When testing according to specifications, the following details will be explained:
(a) Number of samples tested
(b) Insertion force and pull-out force
(c) Plugging rate
(d) Possible insertion depth.
5. References
The data form includes:
(a) Test title
(b) Sample description including installation tools
(c) Test instruments used
(d) Test steps
(e) Assessment and observation
(f) Test date and operator name.
Communication Equipment M16 cable
1. Mounting fixture that allows the sample to be installed in a normal manner.
2. During the test, the force gauge or force distance gauge shall be placed in the proper position of the connector so that the reading pointer is in the middle of the gauge, so that the operation gauge can be accurate to ± 2%.
3. According to the requirements, the auxiliary measuring instrument shall match the test sample and be accompanied with the force measuring table and torque table (axial pressure, etc.).
b) . test steps
1. Unless otherwise specified, the sample shall be installed as normal.
Communication Equipment M16 cable |
Communication Equipment M10 cable
(from EIA recommendation No. 1653. Organized by EIA working group p-5.12.)
Note: tp-13a was previously published as tp-13 in EIA recommendation rs-364-3.
1. Purpose:
The purpose of this test is to introduce a standard method for determining the insertion force required for an electronic connector or its protective cover.
2. Sample preparation
The test sample consists of a plug and a contact socket. Unless otherwise specified, the sample shall consist of all available hardware including edges, hoods, clamps, screws, guides or sockets. Unless otherwise specified in the specification, the sample does not need to be lubricated or cleaned by any means.
3. Test method
a) . test instruments
Monday, May 11, 2020
Communication Equipment M12 x-code 8pins M30 connector
Communication Equipment M12 x-code 8pins |
Communication Equipment M12 x-code 8pins |
Communication Equipment M16 connector
Communication Equipment M12 connector
Communication Equipment M12 connector |